Representative experience

Demolition experience, shown in context.

Recent Synergy work and photographs from our leadership’s prior demolition experience.

Recent Synergy work

Commercial demolition in Charlotte.

Completed · August 2026

Commercial restroom demolition

Location
Charlotte, North Carolina
Scope
Restroom demolition, Phase 2
Schedule
August 26–29, 2026
Result
Completed and accepted August 29
September 2026

Office tower flooring removal

Location
Charlotte, North Carolina
Work area
Levels 9 and 10
Scope
Carpet, VCT, and ceramic tile with mud bed
Scope limits
Adhesive removal and floor preparation excluded

Work started September 8, 2026.

Leadership’s prior experience

A closer look at the work.

These field photographs show work from prior companies and leadership roles. They are separate from the recent Synergy projects above.

Interior industrial space with retained columns and roof framing during selective demolition

Interior & selective

Interior selective removal

Selective removal inside an industrial building, with columns, roof framing, and adjacent construction retained. The work area shows why overhead conditions, defined removal limits, and material routes matter during an interior demolition scope.

  • Interior access
  • Retained columns and framing
  • Overhead work
Yellow excavator demolishing a low-rise commercial building, with brick and concrete block debris in the foreground

Full building demolition

Complete commercial building removal

A low-rise commercial building during full demolition, with an excavator working among brick, concrete block, and structural debris. The photograph shows building removal in progress and the space needed for equipment access and material handling.

  • Full building removal
  • Equipment access
  • Debris handling
Parking structure panel removal using cranes and elevated work platforms

Structural removal

Parking structure panel removal

Concrete panel removal from a multilevel parking structure using cranes and elevated work platforms. The retained decks, lifting access, and available landing area are visible in the photograph; these conditions shape each release and pick.

  • Retained structure
  • Release sequence
  • Controlled movement
Industrial demolition site with brick rubble, heavy equipment, and a tall smokestack

Industrial demolition

Industrial building removal

Industrial building removal with masonry rubble, heavy equipment, and a tall smokestack in the surrounding work area. Mixed construction calls for defined removal boundaries and a coordinated route from demolition to material separation and loading.

  • Mixed construction
  • Material separation
  • Site logistics
Excavator performing nighttime demolition beside an exposed concrete structure

Heavy demolition

Night structural demolition

An excavator working beside an exposed concrete structure at night. Equipment access, work-zone separation, lighting, and debris movement must be planned around the available work hours and site conditions.

  • Night operations
  • Equipment position
  • Work-zone control
Harnessed worker using a wall saw from an elevated work platform

Precision removal

Elevated concrete sawcutting

An elevated wall-saw operation carried out from a work platform. The photograph shows the close working relationship between cutting access, fall protection, the retained structure, and the section being removed.

  • Elevated access
  • Cutting sequence
  • Controlled release
Recovered bricks wrapped and palletized for reuse behind a Synergy trailer

Material recovery

Brick recovery and reuse

Recovered brick separated from demolition debris, stacked on pallets, and wrapped for handling. Material recovery requires space for sorting and staging alongside the demolition and hauling operation.

  • Material separation
  • Palletized recovery
  • Reuse planning

Your project

Tell us what needs to come out.

Photos, drawings, and scope notes help us understand the work area, access, retained construction, and intended turnover.

Invite us to bid